Our Projects

Showcasing our portfolio of successful infrastructure developments

Commercial Complex

Islamabad 2023 Commercial

Project Overview

A state-of-the-art commercial building with modern amenities and sustainable design. This 12-story complex features office spaces, retail outlets, and recreational areas.

Project Scope

  • 12-story commercial building with 50,000 sq. ft. of space
  • Modern glass facade with energy-efficient design
  • Smart building management system
  • Underground parking for 200 vehicles
  • Rooftop garden and recreational area
  • LEED Gold certification

Challenges & Solutions

The project site presented challenges due to its location in a densely populated area. We implemented innovative construction techniques to minimize disruption to neighboring buildings and implemented a comprehensive traffic management plan during construction.

Results

The project was completed on schedule and within budget. The building is now fully occupied with premium tenants and has become a landmark in the area.

Residential Complex

Peshawar 2022 Residential

Project Overview

Luxury residential apartments with modern facilities and beautiful landscaping. This residential complex features 120 apartments ranging from 1 to 3 bedrooms.

Project Scope

  • 5 residential buildings with 120 apartments
  • Swimming pool and fitness center
  • Children's playground and community center
  • Landscaped gardens and walking paths
  • 24/7 security and surveillance system
  • Energy-efficient design with solar panels

Challenges & Solutions

The project required extensive earthwork due to the sloping terrain. We implemented innovative soil retention systems and drainage solutions to ensure the stability of the buildings and prevent water runoff issues.

Results

The residential complex has become one of the most sought-after living spaces in Peshawar, with all units sold within six months of completion.

Highway Bridge

Karak 2021 Infrastructure

Project Overview

A modern bridge construction project connecting two major highways, reducing travel time and improving transportation efficiency in the region.

Project Scope

  • 500-meter long cable-stayed bridge
  • 6 lanes with pedestrian walkways
  • Advanced structural design for earthquake resistance
  • LED lighting system for improved visibility
  • Integrated traffic management system
  • Environmental impact mitigation measures

Challenges & Solutions

The bridge crossed a river with variable water levels and required deep foundation work. We employed specialized equipment and techniques for underwater construction and implemented a comprehensive environmental protection plan.

Results

The bridge has significantly reduced travel time between two major cities and has become an important transportation link in the region, handling over 50,000 vehicles daily.

Ready to Start Your Next Project?

Contact us today for a free consultation and quote

Get in Touch